BRIDGE

山西朔州七里河景观桥改造设计 2010

A) WATER BRIDGE RECONSTRUCTION: THE STATUS OF THE BRIDGE FOR THE WATER, THE WIDTH OF THE NARROW BRIDGE, AND THE HIGHER ALTITUDE, IS NOT CONDUCIVE TO PEDESTRIANS. OUR APPROACH IN THE DESIGN: 1. TO EXTEND THE LENGTH OF THE BRIDGE; 2. SLOW DOWN THE SLOPE OF THE BRIDGE; 3. THE OUTER SKIN DECORATION;
OPTION (A): WE USED A DISTORTED ARC EXPANSION OF THE BRIDGE SPACE AS A MEANS TO ATTRACT TOURISTS TO THE BRIDGE FROM THE GROUND, THE MIDDLE OF THE BRIDGE, WE DESIGNED A VIEWING PLATFORM. AND WE ALSO HAD TWO GATES OUTSIDE THE SKIN PACKAGING LANDSCAPING.
OPTION (B): THE MAIN VERTICAL LINES OF THE GRILLE TO THE MAIN SECTION WILL WRAP UP THE BRIDGE, WHILE GRILLE SECTION IN THE FACADE DESIGN, MADE A RHYTHM CHANGE, THE PEDESTRIAN BRIDGE AT DIFFERENT ANGLES TO SEE THE OUTER BODY OF LEGISLATION FACE IS DIFFERENT, AND THE CHANGES IN LIGHT AND SHADOW IS ALSO RAPIDLY CHANGING.

B) OLD BRIDGE RECONSTRUCTION: A BADLY DAMAGED OLD BRIDGE DECK, RAILINGS BASICALLY BEEN DESTROYED, BUT THE ARCH RETAINED INTACT.
OPTION (A): THE TEXTURE OF WATER DESIGN, WE FOCUS ON THE RAILING OF THE TRANSFORMATION, WE BROKE THROUGH THE RAILING OF THE CONCEPT, THE RAILINGS AND LANDSCAPE COMBINED WITH THE CURVATURE WE HAVE DESIGNED TWO OVERFLOW POOL, MEET LANDSCAPE AND PROTECTION.
OPTION (B): BARS WITH THE DESIGN GRID, TO BRIDGE THE THREE-DIMENSIONAL PACKAGING, THE GRID STRUCTURE AND MATERIALS TO DO A DETAILED DESIGN.


 

A)水利桥改造:针对水利桥的现状,桥面宽度窄,而且高度较高,不利于行人行走。我们在设计上采用的方法:1.延长桥的长度;  2.减缓桥的坡度; 3.进行外表皮装饰;
方案(一):我们采用了扭曲的弧线作为扩大桥体空间的一种手段,把游客从地面吸引到桥上,在桥的中间我们设计了一个观景平台。而两个闸门我们也进行了外表皮包装美化。
方案(二):主要以竖线条的格栅条为主,将桥体包装起来,同时格栅条在立面设计上,做了一个韵律变化,行人在不同角度看到的桥体的外立面都不一样,而且在光影的变化上也是变化多端的。

B)旧桥改造:旧桥桥面破损严重,栏杆基本被破坏,但桥拱保留完好。
方案(一):以水的纹理进行设计,我们主要针对了栏杆的改造,我们突破了栏杆的概念,把栏杆和景观结合起来,我们设计了两个带有曲度的溢流池,满足了景观和保护的功能。
方案(二):栏杆结合网格来设计,把桥体进行三维包装,网格的结构和材料均做了详细的设计。

TJR
http://www.tangjianren.com
 
back/返回